Yard, concrete and fence materials
Enter the area and the depth to get cubic yards to order. Count posts and sections for a straight fence below.
Mulch 2-3 in, a concrete slab 4 in.
Fills in from the material; edit it.
Fence run
A straight run, no gates or corners.
Match the panel or rail length.
How it works
Volume is length times width times depth, with depth turned into feet. A cubic yard is 27 cubic feet. The waste allowance covers uneven ground and spills. For concrete, an 80 lb bag of mix yields about 0.6 cubic feet, which is 45 bags per cubic yard.
Example: 20 by 10 ft at 3 in is 50 cubic feet, or 1.85 cubic yards of mulch. A 10 by 10 ft slab at 4 in with 10% waste needs 62 bags of 80 lb mix; at that size a ready-mix truck is often easier to price than 62 bags.
Fence posts
The fence tool counts sections as the run divided by the post spacing, rounded up, plus one end post. It does not count gate posts, corner posts or extra bracing, and a line of posts needs a hole depth that suits your frost line and your local code. Check fence repair and replacement, and your city for permit and setback rules.
Gravel is sold by the ton and varies; the 1.4 tons per cubic yard used here is a rough planning figure, so ask your supplier. See also landscaping and driveway repair and replacement.